Stratton Environmental Management

Food & Regulated Sites

Audit-ready evidence, structured for food and regulated sites.

For food production, logistics, and regulated environments, the question is rarely whether a technician attended. It is whether the record holds when an auditor, a retailer, or an inspector asks to see it.

On a regulated site, a pest finding is a documentation event.

A finding is a documentation event.

An incident here is rarely just a pest problem. It is a question of contamination risk, of whether corrective action was taken and recorded, and of whether the site can show control when reviewed.

A generic visit sheet does not answer those questions. A structured, traceable record does.

Built for scrutiny.

The programme is designed around the evidence external review expects: continuity from one visit to the next, closure on every open action, and proportion between activity and response.

What a programme delivers

A record built for this sector.

  1. 01Inspect
  2. 02Record
  3. 03Recommend
  4. 04Assign
  5. 05Verify
  6. 06Review
  • A structured report of findings and actionsProduced after every visit.
  • A maintained corrective action registerTracked to closure.
  • Trend analysisAcross species and seasons.
  • Audit-ready documentationOrganised for the regime your site answers to.

Where monitoring is used, it is justified point by point and interpreted on site, not deployed for appearances.

Framework alignment

Structured around recognised documentation expectations.

Stratton structures its evidence around recognised documentation expectations. It supports the documentation and evidence these frameworks typically require. It does not claim certification to them on your behalf, and SEPOS is a proprietary operating standard, not an accreditation.

  • BRCGS
  • SALSA
  • CRRU-conscious stewardship

In practice

What this looks like for a client.

  • Stratton's approach has helped us treat pest management as part of site risk control, rather than as a separate contractor function operating in the background.
    Technical Manager, UK Food Manufacturing Site

Start with a site review.

A site review assesses the risk on your site, the documentation it should produce, and the programme structure that would suit it. You receive a written summary and a recommended route. Following the review, Stratton will recommend a suitable route, or advise clearly where the site is not the right fit.