Stratton Environmental Management

Integrated Site Protection

Integrated site protection.

For sites where routine provision is not enough, the components work as one governed programme.

Who this is for

Built for a specific kind of site.

  • Complex or high-consequence sites where a single service is insufficient.
  • Multi-site portfolios needing one coherent standard, not a patchwork.
  • Operators who want the components to connect, not run in parallel.

When routine provision is not enough.

Some sites carry enough risk that inspection alone, or monitoring alone, leaves gaps. Integrated site protection brings the components together so they reinforce one another rather than operate in isolation.

Integrated pest management, run as one programme.

Integrated pest management is an established discipline in the industry. It is not a Stratton invention, and it is not a certification that anyone issues. Its principle is straightforward: prevention, monitoring, physical control and treatment are decided together, with chemical intervention treated as a last resort rather than a first response.

What varies between providers is whether the parts are genuinely joined. Inspection finds the activity. Monitoring reads the pressure between attendances. Proofing removes the route in. Hygiene removes the reason to stay. Corrective action turns each of those into an owned item, and review tests whether the programme is working or merely running.

Stratton's contribution is the governance around them: one standard, one record, one point of accountability, so the components inform each other rather than being delivered in parallel by people who never compare notes.

Programme components, governed as one.

The relevant services are combined and run under a single operating standard, with one record and one point of accountability.

One record, one accountability.

The point of integration is coherence: a single record that shows what was found, what changed, what remains open, and what happens next. This is a governed programme, not a certificate, a guarantee, or a pest-free claim.

Governed by SEPOS

Every component of this service runs through the same operating standard: inspect, record, recommend, track, escalate, review. That is what turns the work into a record rather than a sequence of visits.

How SEPOS works

What you receive

What you are left holding.

  • A combined programme designThe right components for the site, connected.
  • One operating standardSEPOS across every component.
  • A single coherent recordNot disconnected activity from several providers.
  • One point of accountabilityEscalation and review through one route.

In practice

What this looks like for a client.

  • We are not receiving pest-control paperwork for the sake of paperwork. We are receiving clear information that helps us make better decisions across the portfolio.
    Regional Facilities Manager, Commercial Property Portfolio

Start with a site review.

A site review establishes the risk profile, the documentation required, and the programme structure that would be appropriate. Stratton will recommend a suitable route, or advise clearly where the site is not the right fit.